SINELINK / COMMERCIAL LEVEL 2 EV CHARGING CLUSTER / A1.3
7 kW vs 11 kW vs 22 kW AC Chargers:
Which One Does Your Site Need?
A simple commercial buyer guide to vehicle demand, parking time, site power and Level 2 charger selection.
~7 kW
Long dwell or limited site power.
~11 kW
Balanced commercial choice for many Type 2 sites.
~22 kW
Higher AC power only when vehicle and site support it.
Quick answer
Choose the lowest power that still meets the charging deadline.
For a commercial site, 22 kW is not automatically better than 11 kW, and 11 kW is not automatically better than 7 kW. The right AC charger is the one that can deliver the required energy during the parking window, while matching the vehicle's onboard charger and the site's electrical capacity.
If vehicles stay for many hours, more 7 kW or 11 kW ports can be more useful than fewer 22 kW ports. If vehicles need more energy in a shorter time, higher AC power can help only when both the vehicle and site can use it.
If a 22 kW wallbox delivers only 7 kW or 11 kW, the limit may come from the vehicle, site supply or charger configuration. Read why a 22 kW EV charger may charge at only 7 kW or 11 kW. This page focuses on the next step: choosing the right charger rating before a B2B order.
1. Start with four numbers before comparing chargers
- How much energy does the vehicle normally need during one parking session?
- How long will the vehicle remain parked?
- What AC power can the vehicle's onboard charger accept?
- How much electrical capacity is available to the charging site?
These four numbers tell you more than the charger catalogue. A higher charger rating only creates value when the vehicle needs the speed, can accept the power, and the site can supply it.
2. A simple commercial comparison
| Power | Typical commercial fit | Parking pattern | Main advantage | Main risk |
| ~7 kW | Workplace, hotel, apartment, long-stay parking | 6–10+ hours | More ports under limited site power | Too slow for short parking or high daily energy |
| ~11 kW | Many Type 2 commercial sites | 3–8 hours | Good balance of speed and site load | Vehicle may still accept less |
| ~22 kW | Higher-power AC projects with compatible vehicles | Shorter AC dwell or high daily energy | More energy per connected hour | Often overbought when cars accept only 7/11 kW |
These are buyer-use directions, not universal charging-time guarantees. Actual energy delivered depends on vehicle acceptance, state of charge, temperature, site control and the final installation.
3. 7 kW often suits vehicles that stay for most of the day
A lower-power AC charger can be a strong commercial choice when vehicles remain parked for a long time. This is common at workplaces, hotels, apartment parking and some fleet depots.
- Long dwell gives the charger more hours to deliver the required energy.
- Lower power per bay can allow more charging points under the same site limit.
- Cable and upstream electrical requirements can be easier to manage than a high-power design.
- It can reduce the risk of paying for charger capacity that the vehicle cannot use.
The weakness is simple: if the vehicle arrives with a large energy deficit and leaves soon, 7 kW may not finish the job.
4. 11 kW can be the practical middle ground for three-phase commercial sites
For many Type 2 commercial projects, 11 kW can be a useful balance. It delivers more energy per hour than lower-power AC while using less site capacity than 22 kW.
It can be especially attractive when a large share of the target vehicles accept around 11 kW AC. In that case, buying 22 kW wallboxes may not improve the real vehicle charging speed.
SINELINK's H-Series smart AC wallbox includes 7.4 kW, 11 kW and 22 kW options for suitable single-phase or three-phase installations. The selected model still needs to match the destination market and vehicle mix.
5. 22 kW is useful only when the vehicle, supply and business case support it
A 22 kW AC charger can make sense when the target vehicles can accept high AC power, the site has suitable three-phase capacity, and faster AC delivery improves the operating result.
- The site needs more energy per vehicle during a limited parking window.
- The target vehicle population includes models that can use high AC power.
- The electrical supply can support several chargers without an uneconomic upgrade.
- Higher AC speed improves bay turnover or fleet readiness.
It is a poor investment when vehicles are limited to 7 kW or 11 kW, or when every extra 22 kW port forces an expensive site-power upgrade.
Commercial AC selection path
before departure
acceptance
capacity
to compare
Information guide only; this is not an electrical single-line diagram or final system design.
6. Vehicle AC acceptance can make the 22 kW option useless
The charger does not decide the charging speed alone. The vehicle's onboard charger sets a maximum AC acceptance level.
| EVSE rating | Vehicle AC limit | Site supports | Likely maximum vehicle power |
| 22 kW | 7.4 kW | 22 kW | About 7 kW |
| 22 kW | 11 kW | 22 kW | About 11 kW |
| 22 kW | 22 kW | 22 kW | Up to 22 kW |
| 11 kW | 22 kW | 11 kW | Up to 11 kW |
This is why B2B buyers should send the expected vehicle list to the supplier before choosing the wallbox rating.
7. Parking time can be more important than maximum kW
Commercial charging is an energy-delivery problem. Ask how many kWh each vehicle needs before it leaves.
For example, a workplace vehicle that needs 25 kWh and stays for eight hours does not need a 22 kW average charging rate. A fleet vehicle that needs 70 kWh and has only three hours available creates a very different design problem.
Do not turn these simplified examples into final electrical sizing. Use them to understand the difference between energy need and charger nameplate.
When the project moves from one charger to the full parking site, size the site from vehicles, energy, dwell time and usable electrical capacity.
8. More 22 kW chargers can create a bigger grid problem without creating more customer value
Ten 22 kW chargers create 220 kW of installed nameplate power. Ten 11 kW chargers create 110 kW. The first option is not automatically twice as useful.
- If most vehicles accept 11 kW, the extra installed AC capacity may remain unused.
- Higher nameplate power can increase feeder, switchboard and transformer requirements.
- A limited site may serve more users with more moderate-power charging points.
- The correct comparison is energy delivered per vehicle and service level, not total catalogue kW.
If multiple chargers must share a fixed site limit, the project should also determine whether dynamic load balancing is needed [L2-05]. Power sharing can reduce the combined peak, but it cannot compensate for an undersized daily energy plan.
9. Single-phase and three-phase markets should not be mixed into one rule
The 7/11/22 kW comparison is most useful in markets where AC charging commonly uses Type 2 and three-phase supply. North American Level 2 projects are often specified by 240 V circuit and current rating instead.
For example, the SINELINK GS-B02 Series is a 240 V AC Level 2 platform with 16, 32, 40 and 48 A versions and nominal outputs from about 3.5 to 11.5 kW. A North American buyer should not assume that a European-style 22 kW three-phase comparison applies to the local project.
For North American Type 1 projects, review the GS-B02 Level 2 product range. For Type 2 projects with 7.4/11/22 kW options, review the H-Series AC wallbox family.
The practical choice also depends on whether the site uses single-phase or three-phase supply [L2-06], especially when 11 kW or 22 kW charging is being considered.
10. A simple buyer decision path
| Question | If yes | Next step |
| Do vehicles stay 6–10+ hours? | Lower/moderate AC may be enough | Check 7 kW and 11 kW first |
| Do most vehicles accept 11 kW AC? | 22 kW may add little real speed | Compare 11 kW economics |
| Do vehicles accept 22 kW and need shorter dwell? | 22 kW can create value | Check three-phase supply and site peak |
| Will many chargers operate together? | Site peak becomes important | Use site sizing and load management |
| Is the charging window too short even at 22 kW? | AC may not meet the operating need | Compare AC vs DC |
If the charging deadline is too short for AC, use the commercial AC-versus-DC decision framework before increasing the AC rating further.
11. Product selection should follow the project, not lead it
A B2B quotation should not begin with "Do you want 7, 11 or 22 kW?" It should begin with the site and vehicle data.
- Destination country and connector standard.
- Vehicle models or vehicle class.
- Typical daily energy need per vehicle.
- Parking / dispatch window.
- Available voltage, phase and site capacity.
- Number of charging points now and in the next phase.
- OCPP, RFID, app, billing or backend requirements.
- Load-management requirement.
- Wall or pedestal mounting.
- Project quantity and schedule.
Once charger power has been selected, place that decision back into the wider commercial Level 2 charging plan, including charger quantity, controls, installation and future expansion. Buyers can then compare the SINELINK AC charging range against the confirmed project requirements.
12. The next question is not which kW but how many chargers
Once you have the right power range, the project becomes a site-planning problem. A 20-bay workplace may need a very different mix from a four-bay hotel even when both use 11 kW chargers.
Once the right charger power is defined, the next practical question is how many Level 2 charging points the site can support without exceeding usable electrical capacity. That moves the project naturally into site sizing and load-management planning.
Send the project inputs before choosing charger power.
Share your country, vehicle mix, dwell time, site voltage and phase, available power, required charger quantity, software needs, expansion plan, and schedule.
Discuss your project →FAQ
Is 22 kW always better than 11 kW for a commercial EV charger?
No. 22 kW only creates value when the vehicle can accept it, the site can supply it, and the shorter charging time improves the operating result.
Is 11 kW enough for workplace charging?
Often it can be, because workplace vehicles may stay for several hours. The final choice depends on energy need, parking time, vehicle AC limit, and site capacity.
When is 7 kW the better choice?
It can suit long-dwell parking, sites with limited electrical capacity, or projects that prefer more charging ports over higher power per bay.
Can every EV use 22 kW AC charging?
No. Many EVs accept less AC power. Check the onboard charger specification for the actual vehicle mix.
Does 22 kW AC require three-phase power?
In common Type 2 commercial configurations, 22 kW normally uses a suitable three-phase supply. Final design depends on the market and product.
Should I choose more 11 kW chargers or fewer 22 kW chargers?
Compare vehicle count, parking time, energy need, available site power and whether drivers can move vehicles. More moderate-power ports can be better for long-dwell sites.
Can load balancing make 22 kW chargers work on a smaller site supply?
It can cap or redistribute total charging demand, but each vehicle may receive less power during busy periods. The required daily energy still has to be delivered.
What should I send SINELINK for a recommendation?
Send the country, vehicle mix, parking time, site voltage/phase, available power, required charger quantity, software needs, expansion plan, and project schedule.