8619727737649
sales@sinelinkenergy.com
enLanguage
  • English
  • Français
  • Deutsch
  • 日本語
  • Italiano
  • Español
  • Português
  • русский
  • Kreyòl Ayisyen
  • اردو
  • Polski
  • Svenska
  • Malti
  • slovenščina
  • Català
  • عربي
  • Nederlands
  • 한국어
  • українська
  • Eesti
  • Melayu
  • suomi
  • bosanski
  • dansk
  • Ελληνικά
  • Srbija jezik (latinica)
  • Gaeilgenah Éireann
  • România limbi
  • Lietuvių
  • Latviešu
  • Български
  • فارسی
  • Việt Nam
  • עברית
  • ไทย
  • हिंदी
  • O'zbek
  • Indonesia
  • Türkçe
  • hrvatski
  • বাংলা
  • Čeština
  • Bai Miaowen
  • magyar
  • Norsk
  • slovenčina
  • Cymraeg
  • íslenska
Tianjin SINELINK New Energy Technology Co., Ltd.
  • Home
  • About Us
    • Capabilities
    • Our factory
    • Certificates
  • Products
    • EV Charging
      • AC Charging
      • Charging Management
      • DC Charging
      • Distributed DC Fast Charging Systems
      • EV Charger Power Modules
    • Solar DC Cables
      • TUV Solar Cable
      • UL PV Wire
      • Solar Grounding Cable
      • Energy Storage Cables
      • Protected & Direct Burial Solar Cables
    • Solar PV Connectors
      • Inline PV Connector
      • Branch Connectors
      • PV Combiner Boxes
    • AC Cables
      • Low-Voltage Power Cables
      • Flexible & Pre-Assembled Cables
      • Grounding & Project Cables
    • Residential Energy Storage Systems
      • Hybrid Solar Inverters
      • Standalone Battery Products
      • Integrated Home ESS
      • Battery Packs & Portable Systems
    • Commercial & Industrial Energy Storage Systems
      • Commercial & Industrial ESS Platforms
      • Outdoor ESS Cabinets
      • High-Voltage Battery Cluster Systems
      • BESS Components & Controllers
  • Solutions
    • Commercial & Industrial Energy Storage
    • PV Cable & Connection Solutions
    • Residential Solar & Energy Storage
    • Utility-Scale Solar & Storage
    • EV Charging Solutions
    • Multi-Brand EV Charger Control & Integration Solution
    • Solar Carport Solutions
  • Blog
  • News
    • Industry News
    • Company News
  • Resource
    • Datasheets
    • Download
    • FAQ
  • Projects
  • Contact Us
Home / About Us / Our factory

Our factory

MANUFACTURING & ASSEMBLY

Solar, Energy Storage and EV Charging Facilities

Explore the production and assembly resources relevant to solar DC cables, PV connection products, energy storage systems, and EV charging equipment.

Request Factory Information

dc charging production2.jpg

SINELINK coordinates manufacturing, assembly, and supply resources for renewable-energy projects. The exact legal manufacturing entity, facility and responsibility for an order are stated in the approved quotation and technical agreement.

For the company profile and buyer groups, visit About SINELINK. This page focuses on physical production and assembly evidence; testing, documentation and inspection coordination are explained on Quality & Project Capabilities.

What Is Manufactured and Assembled?

Solar DC cables: conductor preparation, insulation and sheath processing, printing, take-up and reel preparation where applicable.

PV connection products: connector preparation, crimping and cable-assembly workstations for approved component combinations.

Energy storage enclosures: sheet-metal processing, bending, surface finishing and enclosure preparation where applicable.

Energy storage equipment: mechanical and electrical assembly, wiring, component integration and finished-system staging within the agreed boundary.

EV charging equipment: enclosure preparation, component mounting, power and control wiring, connector or charging-cable integration, labeling and functional preparation for approved models.

Solar Cable Production

A solar cable order starts with an approved construction and production specification. The route may include conductor preparation, insulation and sheath processing, product marking, take-up, and reel or coil preparation.

Cable standard, conductor size and material, voltage rating, construction, color, printing and packaging must be confirmed for the destination market and project.

Explore Solar DC Cables →

sinlink  cable factory.webp
Multi-core solar cables..jpg

PV Connectors and Cable Assemblies

PV connector and cable-assembly work requires an approved component combination and assembly drawing. Cable outside diameter, conductor cross-section, contact design, crimping process, sealing components and mating compatibility must be reviewed together.

Only actual available connector families and assembly activities should be assigned to the confirmed facility and order.

Energy Storage Cabinet Fabrication and Assembly

Energy storage enclosures may require sheet-metal processing, bending, welding or fastening, surface preparation, coating and final assembly. Material grade, panel thickness, corrosion protection, coating and ingress-protection targets are project-specific.

Photographs and equipment descriptions should identify the actual process without implying that every cabinet follows the same production route.

peek shaving 1.jpg
image-20260622153306-7.jpeg

BESS Assembly and Integration

Within the agreed integration boundary, assembly can involve enclosure preparation, component mounting, battery module or rack installation, power and control wiring, thermal-management and fire-safety interfaces, protection devices and communications hardware.

The approved bill of materials, single-line diagram and project specification govern the final configuration.

Explore C&I Energy Storage Systems →

EV Charging Equipment Assembly

For approved AC or DC charger models, the production route may include enclosure preparation, power-module and control-component mounting, internal wiring, connector or charging-cable integration, communication setup, labeling and functional preparation.

Rated power, input supply, connector interface, communications, protection requirements, mounting method and destination-market documents must be confirmed for each project.

Explore EV Charging Solutions →

SINELINK EV CHARGING FACTORY

01  Requirement review: approved construction, drawing, model, quantity, destination, and packaging.

02  Material and component staging: inputs prepared for the specified product route.

03  Production or fabrication: actual cable, connector, enclosure or system-assembly activity.

04  In-process control: defined checks at relevant production stages.

05  Final preparation: identification, workmanship, quantity and shipment readiness.

06  Packing and staging: product-specific protection and order identification before release.

Quality Control: Short Summary

Manufacturing controls connect approved order requirements with the finished product. Because the inspection plan differs for cables, PV connection products, energy storage systems and EV charging equipment, review the applicable checks and records for the exact order on Quality & Project Capabilities.

Factory Visit and Remote Review

Buyers may request an on-site visit, video review or production-information package. Send the product family, project background, proposed timing and review scope. Access is subject to production scheduling, safety rules, confidentiality and confirmation by the responsible facility.

Email: sales@sinelinkenergy.com

Manufacturing Facilities: FAQ

What manufacturing activities does SINELINK support?

The presented scope includes solar cable production, PV connection and cable-assembly activities, energy storage enclosure fabrication, BESS integration and EV charging equipment assembly support.

Can buyers visit the factory?

An on-site visit or remote review may be arranged after the product family, review scope and timing are confirmed, subject to safety, scheduling and confidentiality requirements.

Does SINELINK manufacture both solar cables and energy storage systems?

SINELINK supplies both groups through coordinated manufacturing, assembly and supply resources. The legal entity and integration boundary can differ by product.

Can buyers review EV charger assembly and testing?

A facility visit, remote review or order-specific evidence may be discussed after the charger model, responsible facility, review scope and production schedule are confirmed.

Can products be customized?

Selected cable construction, printing, packaging, connection assemblies, enclosures or ESS configurations may be reviewed. Feasibility, certification impact, MOQ and lead time require confirmation.

Where can buyers review testing and quality capabilities?

The separate Capabilities page explains specification review, inspection categories, technical documents, third-party inspection and delivery support.

Request a focused factory review.

Send the product family, target specification, timing, and processes or records you want to review.

Request Factory Information
Contact Us
Tel:+8619727737649
Email: sales@sinelinkenergy.com
Address: Rooms 313–315, North Tower, Xin'enhua Tibei Science and Technology Innovation Park, Heiniucheng Road, Hexi District, Tianjin, China.
Quick Navigation
  • Home
  • About Us
  • Products
  • Solutions
  • Blog
  • News
  • Resource
  • Projects
  • Contact Us
  • Showroom
  • Sitemap
Categories
  • EV Charging
  • Solar DC Cables
  • Solar PV Connectors
  • AC Cables
  • Residential Energy Storage Systems
  • Commercial & Industrial Energy Storage Systems
QR Code
QR Code

Copyright © Tianjin SINELINK New Energy Technology Co., Ltd. All Rights Reserved.Privacy Policy

whatsapp

Phone

E-mail

Inquiry

Bag
0