Tianjin, China
Distributed Rooftop Solar Power Project
Project Overview
On the rooftops of Tianjin Huaming Group, rows of solar panels quietly turn sunlight into clean electricity. Covering a construction area of 20,202.5 square meters, this distributed rooftop photovoltaic project makes effective use of available building space and brings renewable energy closer to daily business operations.
By installing solar power systems on existing rooftops, the project helps improve energy efficiency, reduce electricity consumption from the grid, and support the company's transition toward cleaner and more sustainable energy use.
Project Challenges
- Limited rooftop space and complex installation conditions
- Careful cable routing and safe DC-side connection requirements
- Long-term outdoor exposure to sunlight, wind, rain, and temperature changes
- Need for suitable energy storage capacity planning based on site load demand
- Coordination between PV system, ESS products, and electrical accessories


SINELINK's Role
SINELINK provided PV cables, solar connectors, supporting electrical accessories, and matched energy storage products for the project.
We also participated in the technical solution design, including cable selection, connector matching, accessory configuration, energy storage capacity planning, and ESS product matching.
This project shows how commercial rooftops can be used not only for clean power generation, but also for smarter energy management through solar-storage integration.
