Product Overview

The outdoor high-voltage LFP battery cabinet platform using 3.2V/314Ah cells and 16kWh packs. Twelve configurations cover 64.3–241kWh with industrial air conditioning, multiple DC protections and optional fire-suppression choices.
Confirm pack count, operating voltage and inverter DC window together.
Engineering Features
-
Scalable 4–15 Pack Architecture
Twelve factory configurations support staged project sizing.
-
Outdoor Environmental Design
IP54 cabinet protection and IP65 key components support controlled outdoor deployment.
-
Industrial Temperature Control
Air conditioning manages cabinet temperature across changing ambient conditions.
-
Integrated DC Protection
Overcurrent, short-circuit, overvoltage and overtemperature protection are stated.
-
Optional Fire Suppression
Aerosol or Novec 1230 is available subject to confirmed configuration.
Technical Specifications
All values are for reference and may change without prior notice. Confirm the final approved datasheet and project configuration.
Air-conditioning and Fire-system Basics
Air conditioning controls temperature, not humidity by itself
Condensation risk still depends on sealing, dew point, door opening and drainage.
Derating begins before the maximum altitude and temperature
Apply the stated derating above 45°C and 2000m when calculating usable power.
Optional fire suppression must be specified early
Agent type, detection, interlocks, ventilation shutdown and local code acceptance affect the whole cabinet design.
Outdoor Battery Cabinet Integration and Alarm Check
Rack integration: Confirm battery-rack arrangement, high-voltage interfaces and BMS hierarchy against the cabinet design.
Auxiliary systems: Review air-conditioning, fire-system, sensor and auxiliary-power interfaces as part of the assembled cabinet.
Alarm verification: Record communication, temperature, protection and project-defined alarm checks before site delivery.
Recommended Applications
- Commercial and industrial storage
- Solar-plus-storage and peak shifting
- Remote microgrids
- Outdoor backup-power systems
Installation and Maintenance
- Prepare a level foundation and lifting plan.
- Preserve door seals and side cable-entry sealing.
- Maintain air-conditioner filters, condensate path and alarm status.
- Verify DC protection, grounding and communication before energizing.
- Inspect fire-system status according to the approved maintenance plan.
Packing and Transport

Use approved packaging and lifting points, protect terminals and interfaces, keep equipment upright and dry, and comply with lithium-battery transport documentation and carrier rules. Inspect for impact, deformation, moisture or abnormal heat before acceptance.
FAQ
What does 0.5P mean?
At rated energy, 0.5P corresponds conceptually to a two-hour power level, subject to system limits.
Are all fire agents included?
No. The catalogue lists aerosol / Novec 1230 as optional; confirm the ordered scope.
Can the cabinet operate at 5000m without change?
The catalogue requires derating above 2000m.
Configure the Outdoor ESS Cabinet for Your Site
Send the load profile, required energy and power, site conditions, grid parameters, communication needs and target market for engineering review.
Send Inquiry NowTechnical Specifications
All values are for reference and may change without prior notice. Confirm the final approved datasheet and project configuration.