H07RN-F CEE Industrial Extension Cable

H07RN-F CEE Industrial Extension Cable

Product: H07RN-F CEE industrial extension cable
Product format: Pre-assembled cable with industrial plug and connector
Cable type: H07RN-F flexible rubber cable
Cable rated voltage: 450/750V; complete assembly voltage depends on the selected connectors
Connector system: IEC 60309 industrial connectors
Reference current ratings: 16A, 32A, 63A and 125A, subject to configuration approval
Reference voltage systems: 230V single phase or 400V three phase
Single-phase connector format: Blue, 2P+E
Three-phase connector format: Red, 3P+N+E
Send Inquiry
Description
Technical Parameters
SINELINK

H07RN-F CEE Extension Cable

FLEXIBLE & PRE-ASSEMBLED CABLES

03 / PRE-ASSEMBLED INDUSTRIAL CABLE

Specify the connection. Receive the assembly.

The H07RN-F CEE Extension Cable combines a heavy-duty 450/750 V flexible rubber cable with compatible IEC 60309 industrial plugs and sockets. The factory-assembled format reduces on-site termination work and provides a defined cable length, conductor size, connector rating and pole arrangement for temporary or mobile power distribution.

Specify your requirements →

 product-1195-1139

IEC 60309
Connector configuration
H07RN-F
Rubber cable component
By project
Length & identification

Built around your connection requirements

Configure the assembly for single-phase or three-phase equipment, commonly from 16 A to 125 A. SINELINK can prepare standard lengths or project-specific cable sets with agreed plug orientation, socket type, cable marking, identification labels, packaging and test requirements.

Ready-to-connect cable assembly

The cable, plug and socket are supplied as one specified product, reducing field cutting and termination work.

H07RN-F flexible rubber cable

A recognised heavy-duty cable construction supports industrial, construction and temporary-power applications within the approved product limits.

IEC 60309 connector options

Select compatible industrial plug and socket formats for the required voltage, current, pole arrangement and protection level.

Standard and project lengths

Common lengths simplify routine purchasing, while custom lengths help reduce unnecessary joints and excess cable on site.

Assembly identification and testing

Agreed labels, electrical continuity checks, polarity checks and inspection records can support project delivery and asset management.

CEE extension cable configuration reference

The following are common planning combinations, not a guaranteed current-carrying table. Final cable sizing and available connector versions require order-specific review.

Connector rating Pole format Common cable size Typical application
16 A 230 V 3 pole H07RN-F 3G2.5 Single-phase industrial tools and temporary power
32 A 230 V 3 pole H07RN-F 3G6 Higher-current single-phase tools and temporary power
16 A 400 V 5 pole H07RN-F 5G2.5 Three-phase equipment with neutral and earth
32 A 400 V 5 pole H07RN-F 5G6 Larger three-phase tools and distribution
63 A 400 V 5 pole H07RN-F 5G16 Temporary distribution and industrial equipment
125 A 400 V 5 pole H07RN-F 5G35 High-current temporary distribution

Check cable length, voltage drop, installation method, ambient temperature, duty cycle and protective-device coordination before confirming a configuration.

Configure the finished cable set

Ordering item Configuration to confirm
Length 5 m / 10 m / 25 m / 50 m reference lengths; project-specific lengths by agreement
End arrangement Plug to socket; plug to free tail or other arrangements subject to approval
Protection IP44 or IP67 connector versions for review. Complete assembly protection depends on the selected components, mating condition and cable entry.
Identification Agreed cable marking, length label, project label or asset code
Packaging Individual coil, bag, carton or project packaging

Define the inspection plan before assembly

Cable entry & strain relief

Agree the connector model and cable outside diameter so the entry, seal and clamping arrangement can be reviewed together.

Electrical verification

Specify visual inspection, continuity, polarity and protective-earth continuity. Agree insulation and dielectric testing against the approved assembly test plan.

Traceable identification

Confirm the label content and inspection records required with delivery.

Select for the installation

  1. Confirm voltage, frequency, current rating, pole arrangement and connector clock position before ordering.
  2. Select conductor cross-section from load current, cable length, voltage drop, ambient temperature, installation method and protective-device coordination.
  3. Use compatible plug and socket protection ratings throughout the connection. The overall assembly performance is limited by the lowest-rated component and the installed condition.
  4. Confirm neutral and protective-earth requirements. Do not assume that every three-phase load uses the same three-, four- or five-pole arrangement.
  5. Avoid coiling a heavily loaded extension cable unless the product instructions explicitly permit it. Heat dissipation changes when cable remains wound.
  6. Inspect the cable, plug, socket, strain relief and contacts before use. Remove damaged assemblies from service and have them assessed by a qualified person.

Frequently asked questions

Is this the same product as bulk H07RN-F cable?

No. Bulk H07RN-F is supplied for installation or assembly. This CEE extension cable is a finished product with specified connectors, cable length, conductor size and assembly testing.

Does the cable voltage define the complete assembly rating?

The 450/750 V designation describes the H07RN-F cable component. Order the complete assembly for the required system voltage, connector rating, pole arrangement and operating conditions.

Can SINELINK provide a custom cable length?

Project-specific lengths can be quoted after the connector rating, cable size, voltage-drop requirement, labels, packaging and testing requirements are confirmed.

PROJECT ENQUIRY

Request a CEE Cable Assembly Quotation

Send the destination market, system voltage, current rating, pole arrangement, plug and socket protection level, cable length, expected load, operating environment, required labels, packaging and test documents. SINELINK will review the complete assembly configuration before quotation.

Hot Tags: h07rn-f cee industrial extension cable, China h07rn-f cee industrial extension cable manufacturers, suppliers, factory

CEE extension cable configuration reference

The following are common planning combinations, not a guaranteed current-carrying table. Final cable sizing and available connector versions require order-specific review.

Connector rating Pole format Common cable size Typical application
16 A 230 V 3 pole H07RN-F 3G2.5 Single-phase industrial tools and temporary power
32 A 230 V 3 pole H07RN-F 3G6 Higher-current single-phase tools and temporary power
16 A 400 V 5 pole H07RN-F 5G2.5 Three-phase equipment with neutral and earth
32 A 400 V 5 pole H07RN-F 5G6 Larger three-phase tools and distribution
63 A 400 V 5 pole H07RN-F 5G16 Temporary distribution and industrial equipment
125 A 400 V 5 pole H07RN-F 5G35 High-current temporary distribution

Check cable length, voltage drop, installation method, ambient temperature, duty cycle and protective-device coordination before confirming a configuration.

Send Message